• Bifacial Solar Fencing

    Quantum Leap in Solar Energy & Regenerative Agriculture

Bifacial Solar Fence Systems can radically transform Solar Energy systems & Agriculture Operations

  • Reduce System Installation Costs for solar systems
  • Dramatically reduce maintenance costs for both Solar and Ranch operations
  • Generate Power through solar fence energy generation profile & Power Production on both sides of east & West Solar panels
  • Stacking Functions of Power generation, distribution, precision irrigation, fire protection  & lighting

A Quantum Leap for multiple sectors

Bifacial Solar Fencing Webinar

Deep Dive into the transformational opportunity of Bifacial Solar Fencing and how they can radically transform Solar Energy systems & Agriculture Operations .

Download the Bifacial Solar Fencing Presentation

Fencing is A Major Farm & Ranch Expense

Fencing costs are one of the most expensive aspects of livestock grazing.

 The type of fence constructed greatly impacts the cost per foot, total cost, and annual ownership cost. In addition, the shape of the paddocks affects the amount of materials needed and labor required for construction of the fence.

All fencing has:

    • High initial capital and labor cost for installation  
    • High ongoing maintenance and repair Expense 
    • Labor Intensive
    • Frequency of management dramatically impacts risk to crops & livestock

Fence Building Costs & Maintenance

Publication compares the costs of building and maintaing 1/4-mile (1,320 feet) straight perimeter fence with four different types of permanent fencing
This figure shoes Annual average ownership cost by fence type. Shows an average of 5-8% of installation cost annually $121-$138 per 1/4 mile of fence.

Structural Benefits:

Bifacial Solar Fencing provides a spectrum of structural benefits: 

  • Strong & Durable with a Long lifetime for the whole fence system with performance guarantees
  • Two-dimensional solar structure uses virtually no horizontal ground space. 

Fence Frame:

  • Galvanized steel mullions and crossbeams Fence Rack  provides 25-40 year guarantee
  • Can be mixed with wood, wire and cable systems 
  • High strength requirements for snow snd wind loads.

Bifacial Solar Modules:

  • Strongest & Most Highly Engineered glass in the world
  • Guaranteed to operate at 80% performance for 25-40 years

Bifacial Solar Fencing Dynamic Design Potential

From a Design perspective Bifacial Solar Fencing provides a spectrum of design options. 

Higher fences can support better containment and produce 2X the power from the same solar panel with a small increase in rack expense. The fence can also act as barrier for protection from wind, snow, dust, and sound. 

Landscape Orientation:

  • Single Solar panel height can be 3-4’. High with variable space on the bottom. 
  • Double Solar panel height can be 6-10’ High with variable space on the bottom.

Portrait Orientation:

  • Single Solar panel height can be 5-7’. High with variable space on the bottom. 

Support Multi Species Regenerative Rotational Grazing

  • Bifacial Solar Fencing

    Quantum Leap in Solar Energy & Regenerative Agriculture

Empowers Regenerative Rotational Grazing: 

  • Dynamic fence, Paddock and corral designs: Solar fencing strong structure allows for Dynamic fence and corral designs. The Solar Fence can be 1 or 2 solar panels high allowing got 4-9 ft fence heights. With the solar panels in portrait orientation panels can be 5-7 ft high.
  • Multi Species Ag. operations in same Paddock: The addition of wire mesh at the bottom allows for containment of large and small species, ranging from bison to Chickens, Ducks, Rabbits, Quail, etc.
    • Bison 
    • Cows
    • Horses
    • Pigs
    • Goats
    • Lambs
    • Sheep 
    • Chickens, Ducks, Rabbits, Quail, etc.
  • High Security:  The wire mesh and solar panels also provide a high level of security from multiple predators that feed on each animal type.

Stacking Functions- Multi System Integration

Stacking functions. In addition to Containment and security, The Fence system allows for Multi System integration that create increased Operational Performance, cost reduction of installation and maintenance

  • Solar Fence System allows for integration of man other systems,  Power generation, distribution, precision irrigation, fire protection  & lighting
  • Integrated Hydro system:
    • Irrigation
    • Animal Watering
    • Solar Panel cleaning & cooling
    • Fire Protection
  •   Integrated Power system:
    • Electric Fencing
    • Lighting 
    • Irrigation Systems 
    • Equipment & vehicle charging 

Bifacial Solar Fence Summary Of Benefits: 

Economically Positive: 

  • Produces Revenue in long term contracts (25 Year) 
  • Permanently reduces energy expense
  • Capital cost reduction through tax credit, grants & Rebates 
  • Capital paid back within 3-7 Years
  • Better performance though cost efficiency and  power generation profile than fixed solar systems
  • Revenue to support maintenance  
  • 25-40 year guarantees structurally and performance 
  • Electric Vehicle & Equipment  charging 

Empowers Regenerative Rotational Grazing: 

  • Dynamic fence and corral designs for Multi Species Ag. operations
  • Permanent to Mobile installation
  • Security & Predator Protection

Multi Function Operational Performance

Stacking Functions:

  • Integrated Hydro system:
    • Irrigation
    • Animal Watering
    • Solar Panel cleaning & cooling
    • Fire Protection
  • Integrated Power system:
    • Electric Fencing
    • Lighting 
    • Irrigation Systems 
    • Equipment & vehicle charging 

Bifacial Solar Fence Providers

Next2Sun

  • Next2Sun solar fence
  • https://next2sun.com/en/solar-fence/

Sunstream Energy

  • Solar Energy Fence
  • https://sunstreamenergy.ie/

Sunzaun

  • Vertical solar system 
  • https://sunzaun.com/product/

Bifacial Solar Fence Videos

Sunstream Energy

  • Solar Energy Fence
  • https://sunstreamenergy.ie/

Interested in A Plan for Your Bifacial Solar Fence Project?

Interested in creating a Prosperity Plan for integrating Bifacial Solar Fencing as a Agrivoltaic + Storage System for your Farm, Ranch or property?

0 + 4 = ?